Enforcement Rules of Soil and water Conservation Act Article 33

Takeover of performance pursuant to Paragraph 3, Article 24 of the Act is deemed necessary under any of the following circumstances, :1. Where under Paragraph 1, Article 22 of the Act slopeland is utilized exceeding prescribed limits; or, when farming, forestry, fishing, or animal husbandry activities are being conducted, land is not used pursuant to Article 10 of the Act or soil and water conservation is not treated and maintained in accordance with Soil and Water Conservation Technical Specifications, if no cure is made within the time limit prescribed by the regulatory authority in conjunction with the relevant authorities or if the soil and water conservation treatment and maintenance does not conform to for Soil and Water Conservation Technical Specifications, to the extent that any of the circumstances described in the subparagraphs of Paragraph 1, Article 35 arises.2. Where either Paragraph 1 or 2, Article 23 of the Act is violated, and no cure is made within the time limit prescribed by the regulatory authority in conjunction with the authority responsible for specific business or the implementation still does not conform to Soil and Water Conservation Technical Specifications; or where an order for suspension of work, compulsory demolition or elimination of work object is not complied with, as a result of which the regulatory authority deems it necessary to take over the performance.
中文原文 水土保持法施行細則第33條
有下列各款情形之一者,應認為有必要依本法第二十四條第三項規定代為履行:
一、有本法第二十二條第一項所定之山坡地超限利用,或從事農、林、漁、牧業,未依本法第十條規定使用土地或未依水土保持技術規範實施水土保持之處理與維護,由主管機關會同有關機關限期改正而屆期不改正或實施不合水土保持技術規範,致有第三十五條第一項各款情形之一者。
二、違反本法第二十三條第一項或第二項規定之一,由主管機關會同目的事業主管機關限期改正,而屆期不改正或實施仍不合水土保持技術規範,或令其停工、強制拆除、清除工作物而不為,經主管機關認為有必要代為履行者。

English translation for reference only; the Chinese text prevails. Not legal advice.