Enforcement Rules of Soil and water Conservation Act Article 29

Upon the occurrence of any of the circumstances described in the subparagraphs of Paragraph 1, Article 35, the special municipality or county/city regulatory authority treating and maintaining soil and water conservation on an emergency basis pursuant to Article 26 of the Act shall request the soil and water conservation obligor to take the necessary emergency action against calamity within a prescribed time limit, with a copy to the authority responsible for specific business, and, where necessary, further order the soil and water conservation obligor to present an anti-calamity emergency plan within the prescribed time limit and implement such plan upon said its approval.The soil and water conservation obligor shall suspend work upon the occurrence of the above circumstance during the work period of soil and water conservation. The original soil and water conservation plan must immediately be revised if such revision is necessary in line with the implementation of the anti-calamity emergency plan. Work may not resume under the original soil and water conservation plan until after the implementation of the emergency measures and the emergency plan above passes the inspection of the regulatory authority in conjunction with the authority responsible for specific business. The regulatory authority may extend the original work period at its discretion.
中文原文 水土保持法施行細則第29條
有第三十五條第一項各款規定情形之一,直轄市、縣(市)主管機關依本法第二十六規定實施緊急處理與維護時,應通知水土保持義務人限期採取必要之緊急防災措施,並副知目的事業主管機關;其有必要者,應限期命水土保持義務人提送緊急防災計畫,經核可後實施。
水土保持計畫施工期間有前項情形者,水土保持義務人應暫行停工。
原水土保持計畫須配合緊急防災計畫之實施而辦理變更者,應即辦理變更,並經主管機關會商目的事業主管機關檢查緊急防災措施或緊急防災計畫之實施合格後,始得繼續施工;其原施工期限,主管機關得視實際狀況酌予展延。

English translation for reference only; the Chinese text prevails. Not legal advice.