Enforcement Rules of Soil and water Conservation Act Article 20

The contents of a long-term soil and water conservation plan for a designated soil and water conservation area mentioned in Article 19 of the Act are as follows:1. Type delimited and purpose of delimitation.2. Location, scope and area delimited.3. Plan depicting the current land use (on a scale not less than 1/5,000).4. Basic information on the environmental condition, including the geology, soil, ecology, meteorology, and hydrology of the environment, land ownership, and the managing authority.5. Layout depicting the overall soil and water conservation planning (on a scale not less than 1/5,000).6. Plan depicting the order in which soil and water conservation is to be treated and maintained in different areas by stages (on the same scale as mentioned in the preceding subparagraph, and marked in different colors by the stages of handling).7. Content, enforcement unit, method of enforcement, estimated budget with respect to the handling plan for different stages and areas.8. Restrictions.9. Location, scope, content and reason for the requirement for specific or general workmanship in handling.10. Funds and source thereof.
中文原文 水土保持法施行細則第20條
依本法第十九條所擬定之特定水土保持區長期水土保持計畫,其內容如下:
一、劃定類別及目的。
二、劃定位置、範圍、面積。
三、土地利用現況圖(比例尺不得小於五千分之一)。
四、環境現況基本資料,包括環境地質、土壤、生態、氣象、水文、土地權屬及其管理機關。
五、水土保持整體規劃配置圖(比例尺不得小於五千分之一)。
六、分期、分區水土保持處理與維護順序圖(比例尺同前款,以分期處理別著色標示)。
七、分期、分區處理計畫內容、執行單位、執行方法、估計經費。
八、管制事項。
九、須以特殊工法或綜合工法處理之地點、範圍、內容及理由。
十、經費及來源。

English translation for reference only; the Chinese text prevails. Not legal advice.