Regulations for Safety Inspection of Hazardous Machines and Equipment Article 9
Before manufacturing or modifying the fixed type cranes, the Manufacturer shall fill up the type inspection application (Annex 1) and submit the same along with the following documents to the local inspecting organization for application of inspecrion:1. Type of the crane to be inspected, criteria of strength calculation and assembly sketches for the fixed crane applying for inspection.2. Summary of inspection equipment necessary during the manufacturing process.3. Educational background and working experience of the chief designer.4. Educational background and working experience of the construction director.Any alteration of the equipment stipulated in Item 2 or personnel stipulated in Items 3,4 of the preceding Paragraph shall be reported to the local inspecting organization.The inspecting organization shall issue the Qualification Certificate of Type Inspection for Manufacturing Equipment (Annex 2) for qualifiers in the type inspection as stipulated in Paragraph 1.The manufacturing or modification work shall not be carried out without passing the inspection. However, this shall not apply to those cranes whose types and conditions have already qualified through the type inspection.