Regulations for Safety Inspection of Hazardous Machines and Equipment Article 50

In case alterations are made to the original construction elevators by changing the loading carrier, counterweight, pathway tower, guiderail supporting tower or lifting cables, the Employer shall fill up and submit an Application Form(Annex 12), accompanied with the drawings relating to the said alterations, to the Inspection Organization to apply for the alteration inspection of elevators.The date and results of the alteration inspection as well as the altered portions shall be so remarked in the original qualification certificate by the inspecting organization for those elevators being qualified by the said alteration inspection.The requirements stipulated in Articles 44 and 45 shall apply mutatis mutandis to the alteration inspection stated in the preceding paragraph 1.
中文原文 危險性機械及設備安全檢查規則第50條
雇主變更營建用升降機之搬器、配重、升降路塔、導軌支持塔或拉索時,應填具營建用升降機變更檢查申請書(附表十二)及變更部分之圖件,向檢查機構申請變更檢查。
檢查機構對於變更檢查合格之營建用升降機,應於原檢查合格證上記載檢查日期、變更部分及檢查結果。
第一項變更檢查準用第四十四條及第四十五條規定。

English translation for reference only; the Chinese text prevails. Not legal advice.