Regulations for Safety Inspection of Hazardous Machines and Equipment Article 19
If the employer alters any of the following items of the fixed type crane, drawings relating to the altered parts shall be submitted to the inspecting organization for reference and record:1. Prime motor.2. Hoisting structure.3. Steel wire rope or hoisting chain.4. Hook, grab bucket or other devices.5. Braking devices.The requirements stipulated in the preceding Paragraph are not applicable to those alterations where the involved materials, specifications, and dimensions remain unchanged.If the employer changes the lifting capacity of the fixed type crane to a capacity less than that stipulated in item (2) or (3) of Paragraph 1, Article 3, a report shall be made to the inspecting organization for confirmation and revocation of the corresponding inspection qualification certificate.
中文原文 危險性機械及設備安全檢查規則第19條
雇主對於固定式起重機變更下列各款之一時,應檢附變更部分之圖件,報請檢查機構備查:
一、原動機。
二、吊升結構。
三、鋼索或吊鏈。
四、吊鉤、抓斗等吊具。
五、制動裝置。
前項變更,材質、規格及尺寸不變者,不在此限。
雇主變更固定式起重機之吊升荷重為未滿第三條第一款第二目或第三目之容量者,應報請檢查機構認定後,註銷其檢查合格證。
一、原動機。
二、吊升結構。
三、鋼索或吊鏈。
四、吊鉤、抓斗等吊具。
五、制動裝置。
前項變更,材質、規格及尺寸不變者,不在此限。
雇主變更固定式起重機之吊升荷重為未滿第三條第一款第二目或第三目之容量者,應報請檢查機構認定後,註銷其檢查合格證。