After being qualified by the welding inspection, the welding specification for the vessels for high-pressure gases shall be stamped with the qualification mark (annex 34) and signed by the Inspector thereon. s The inspecting organization shall then deliver one ( 1 ) copy of the welding specification to the applicant. The qualification mark shall be printed, painted or posted at distinct locationt of the inspected for identification.