Mass Rapid Transit Act Article 45-2

1. With regard to the buildings, constructions, advertising structures, obstacles, land excavations, or other construction behaviors within the range of a restricted areas which may impede the facilities operation or traffic safety of the mass rapid transit system, the required documents shall be submitted for ratification by the management organization and the competent authority while applying for a construction license or permit. Where the competent authority is conferred the power of discretion in rendering an approval or permit, it may add provisions incidental thereto.2. Where the competent authority verifies the construction behaviors referred to the preceding paragraph shall impede the facilities or operational safety of the mass rapid transit system, it shall inform the management organization to request the applicant to change the construction design, construction methods or take other suitable measures.3. The competent authority may inform and request the constructor, proprietor or supervisor to suspend work when the behaviors referred to the preceding first paragraph are verified to impede the facilities operation or traffic safety of the mass rapid transit system. If necessary, the competent authority shall request the assistance of police or the authority in charge of construction within the jurisdiction, and inform and request the management organization to improve, amend or remove within a given time period.4. The constructor, proprietor and supervisor of the construction behaviors which damage the facilities or impede the operation safety of the mass rapid transit system referred to the preceding paragraph shall be bound to restore the situation to its original condition or make compensation.
中文原文 大眾捷運法第45-2條
限建範圍公告後,於限建範圍內為建築物之建造、工程設施之構築、廣告物之設置、障礙物之堆置、土地開挖行為或其他有妨礙大眾捷運系統設施或行車安全之虞之工程行為,申請建築執照或許可時,應檢附該管主管機關及主管機關規定之文件,由該管主管機關會同主管機關審核;該管主管機關於核准或許可時並得為附款。
經主管機關審核認前項行為有妨礙大眾捷運系統設施或行車安全之虞者,得通知該管主管機關要求申請人變更工程設計、施工方式或為其他適當之處理。
第一項之行為,於施工中有致大眾捷運系統之設施或行車產生危險之虞者,主管機關得通知承造人、起造人或監造人停工。
必要時,得商請轄區內之警察或建管單位協助,並通知該管主管機關令其限期改善、修改或拆除。
前項行為損害大眾捷運系統之設施或行車安全者,承造人、起造人及監造人應負連帶回復原狀或損害賠償責任。

English translation for reference only; the Chinese text prevails. Not legal advice.