Mass Rapid Transit Act Article 24

1. The attaching of associated utility pipelines to the facilities of mass rapid transit system shall commence after obtaining the approval of construction organization.2. The installation of utility pipelines and ditches in the mass rapid transit system shall be approved by construction organization and carried out or supervised by construction organization personnel who have been provided with construction design drawings. The costs of the construction and maintenance of laying utility pipelines, and digging of ditches shall be shared by the owners or users of the facilities.3. The owners or users of the associated utility pipelines and ditches mentioned in the preceding two paragraphs shall not refuse to cooperate when the facilities must be demolished due to the operation of mass rapid transit system. Either owners or users of the facilities and the construction or operation organization of mass rapid transit system shall pay half the costs each after the depreciated value of the demolished material has been deducted as the original facility standards.4. Regulations of categorization, construction cost apportionment, payment, application procedure, construction period, and other relevant issues for the associated utility pipelines and ditches referred to the preceding three paragraphs shall be prescribed by the central competent authority.
中文原文 大眾捷運法第24條
於大眾捷運系統設施附掛管、線,應協調該工程建設機構同意後,始得施工。
於大眾捷運系統用地內埋設管、線、溝渠者,應具備工程設計圖說,徵得該工程建設機構同意,由其代為施工或派員協助監督施工。
工程興建及管、線、溝渠養護費用,由該設施之所有人或使用人負擔。
依前二項規定附掛或埋設之管、線、溝渠,因大眾捷運系統業務需要而應予拆遷時,該設施之所有人或使用人不得拒絕;其所需費用,依原設施標準,按新設經費減去拆除材料折舊價值後,應由該設施之所有人或使用人與大眾捷運系統工程建設或營運機構各負擔二分之一。
前三項管、線、溝渠處理分類、經費負擔、結算給付、申請手續、施工期程及其他相關事項之辦法,由中央主管機關定之。

English translation for reference only; the Chinese text prevails. Not legal advice.