Regulations Governing Airport Terminal Preparation, Construction, and Operation Article 11

The operation management manual shall include the following information:1) Basic information of the airport terminal.2) Map of the geographic location of the airport terminal.3) Aerodrome manual.4) Map of the airport terminal facilities.5) Map of deployment of fire equipments.6) Operating procedures in line with the operations of customs, immigration, quarantine and security control agencies.7) Information on noise- sensitive areas around the airport.8) Self-imposed supervision plan.9) Proof of purchase of liability insurance by the airport terminal.10) Security plan.11) Emergency response plan.12) Airport charge.13) For a non state-operated airport, its operator shall formulate a plan for the allocation and use of noise charge.14) Other matters in relation to operation management and security.The operator of the airport shall file with the CAA for record when any of the contents of the said manual is changed.
中文原文 航空站籌設興建及營運管理辦法第11條
營運管理手冊應包括下列事項:
一、航空站基本資料。
二、航空站地理位置圖。
三、航空站空側手冊。
四、航空站場站設施配置圖。
五、消防安全設施配置圖。
六、配合海關、移民、檢疫及安檢等機關之作業程序。
七、航空站四周噪音敏感地區資料。
八、航空站自我督察計畫。
九、航空站投保責任保險證明文件。
十、航空站安全維護計畫。
十一、航空站緊急應變計畫。
十二、航空站收費費率。
十三、非屬國營航空站者,應檢附噪音補償金之經費分配及使用計畫。
十四、其他有關營運管理及安全事項。
前項手冊內容變更時,航空站經營人應報請民航局備查。