Highway Act Article 17

This English translation was last updated on 2025-12-19, but the Chinese text was amended on 2026-08-17. Later amendments may not be reflected in the translation — please refer to the Chinese text.

After ratification of preparatory work under Article 16, the following requirements shall be prepared and presented to highway authorities within the preparatory period for ratification for the issuance of a construction license prior to construction:(1) The article of incorporation or constitution of the company(2) Land use certificates(3) Construction proposal(4) Construction budget proposal(5) Financial proposal(6) Date to begin construction and estimated construction periodIn accordance with the relevant provisions of the Environmental Impact Assessment Act and the Soil and Water Conservation, the applicant must present an environmental impact assessment or intention to have a soil and water conservation plan, which should be attached on the book drawing files and the regulating authority of the approval documents.
中文原文 公路法第17條
依前條規定審查結果核准籌設者,應在籌設期間內,備具左列文件,申請公路主管機關許可,並繳交許可費後,始得施工:
一、機構組織或章程。
二、土地使用證明書。
三、工程計畫書。
四、工程預算書。
五、資金運用計畫書。
六、開工日期及施工期間預定表。
依環境影響評估法及水土保持法相關規定需辦理環境影響評估或擬具水土保持計畫者,應檢附有關書圖文件及該管主管機關之同意文件。

English translation for reference only; the Chinese text prevails. Not legal advice.