Highway Act Article 15

This English translation was last updated on 2025-12-19, but the Chinese text was amended on 2026-08-17. Later amendments may not be reflected in the translation — please refer to the Chinese text.

When constructing highways and subsidiary projects under Article 14, the following requirements shall be prepared and presented to highway authorities for ratification of preparatory work:(1) Application form(2) Construction proposal(3) Financial proposal(4) Preparatory period timetable
中文原文 公路法第15條
由個人、法人或團體依前條第一項規定興建公路及其附屬停車場時,應備具左列文件,向公路主管機關申請籌設:
一、申請書。
二、興建計畫書。
三、財務計畫書。
四、籌設期間預定表。