Railway Act Article 61-4
In case of violation of regulations of the aforementioned two Articles, any construction beside or along a railway done without permission, or construction that obstructs a railway building or operational satiety, the MOTC may consult and request all presiding authorities to stop construction or activity. The MOTC may request modification, dismantling, improvement, or a remedy within a set deadline. In case there is no presiding authority, the aforementioned disciplinary actions may be executed by the MOTC. The police force of the governing area shall assist, if necessary.In case the aforementioned construction damages railway facilities or endangers operational safety, the applicants, contractors, sponsors, or supervisors shall be responsible for the restoration or pay a damage indemnity.
中文原文 鐵路法第61-4條
違反前二條規定,擅自於鐵路禁建、限建範圍內為第六十一條之二第一項各款行為,或於施工中有妨礙鐵路興建或行車安全之虞者,交通部得商請各該管主管機關令其限期停工、修改、拆除、改善或補正,無該管主管機關者,前開處分得由交通部為之。
必要時,轄區內警察機關應予協助。
前項行為有損害鐵路設施或危害行車安全者,申請人、承造人、起造人、監造人及實際行為人,應負連帶回復原狀或損害賠償責任。
必要時,轄區內警察機關應予協助。
前項行為有損害鐵路設施或危害行車安全者,申請人、承造人、起造人、監造人及實際行為人,應負連帶回復原狀或損害賠償責任。