Railway Act Article 29

For the construction of local or private railways ratified and filed, prior to construction, the following documents shall be prepared and presented to the MOTC for registration and licensing within the set deadline. In case of failure to register by the deadline, the MOTC shall discontinue its pre-opening and report to the Executive Yuan for filing:(1)The layout, cross-section drawings, and their descriptions, after actual route surveys(2) Descriptions and drawings of respective engineering and locomotives trains(3) Staged implementation planning of the entire engineering project(4) Total capital, collected funds, and deadlines for collecting remaining funds(5) Administrative organization and system; private enterprises shall attach company constitutions, stock records, and list of board members, supervisors and managers
中文原文 鐵路法第29條
地方營、民營鐵路之興建,經核准備案後,應依所定期限,將左列文書,送請交通部立案,發給執照,方得施工。
未依核定期限申請立案者,應由交通部廢止其籌辦,並報請行政院備案:
一、路線實測平、剖面圖及說明。
二、各項工程與機車車輛圖式及說明。
三、全部工程分段實施計畫。
四、資本總額、已收款數及餘款續收期限。
五、管理組織系統;民營者應附具公司章程、股東名簿及董、監事、經理人名冊。

English translation for reference only; the Chinese text prevails. Not legal advice.