General Rules of Taiwan Railways Administration, MOTC on Subsidiaries Management Article 3

Taiwan Railways Administration may set up new branches and centers in order to control the electricity communication, signals and centralized control, as well as maintenance for the trains, planning and implementing new engineering projects, monitoring and supervising the electric system for all stations and the facilities in the underground stations, analyzing problems and managing the phone booths:1. Each of the 4 electrical engineering branches in Taipei, Changhua, Kaohsiung and Hualian may set up bureaus and Occupational Safety & Health Office.2. Each of the 5 electrical branches in Taipei, Hsinchu Changhua and Tainan may establish Electricity Dispatch Office.3. Telecommunication Center
中文原文 交通部臺灣鐵路管理局所屬分支機構組織通則第3條
本局為辦理電氣通訊、號誌、中央控制行車制及電化行車設備養護、電務新設工程之規劃施工,全線電訊系統及地下化車站電務設施監視指揮、障礙分析及電話室之管理等,得設下列各段、中心:
一、臺北、彰化、高雄、花蓮等四電務段,各段得設分駐所及勞工安全衛生室。
二、臺北、新竹、彰化、嘉義、臺南等五電力段,各段得設電力調配室。
三、電訊中心。

English translation for reference only; the Chinese text prevails. Not legal advice.