Energy Administration Act Article 18

This English translation was last updated on 2016-11-30, but the Chinese text was amended on 2026-09-23. Later amendments may not be reflected in the translation — please refer to the Chinese text.

The energy user with central air conditioning systems installed shall be equipped with independent electric meter and circuit for such systems, provided its capacity of the refrigerating unit exceeds the level stipulated by the central Competent authority.To facilitate the power consumption management of central air conditioning systems, a vertical integrated utility may adopt differential rates, subject to the approval of the central Competent authority.Rules governing the electric meter, submeters, circuit layout, types of cable used and metering specifications of the air conditioning systems installed by the energy user, shall be stipulated by the central Competent authority.
中文原文 能源管理法第18條
(刪除)

English translation for reference only; the Chinese text prevails. Not legal advice.