Renewable Energy Development Act Article 4

The central competent authority shall consider the domestic climate, energy demand characteristics, economic benefits, technological development, and other factors of different renewable energies upon promoting the installation of renewable energy power generation equipment.Renewable energy power generation equipment with an installed capacity of 2,000 kilowatts or more shall be approved by the centralcompetent authority; those with an installed capacity of less than 2,000 kilowatts shall be approved by the municipal or county (city) competent authority.Renewable energy power generation equipment approved by the central competent authority according to the regulations prescribed in the preceding paragraph shall be subject to the provisions of this Act regarding grid connection and wholesale purchasing. The categories of energy, installed capacity, approval procedure, and other relevant matters for renewable energy power generation equipment mentioned in the preceding paragraphs shall be stipulated by the central competent authority.Electricity enterprises may install self-use renewable energy power generation equipment with an installed capacity of less than 2,000 kilowatts in accordance with the regulations prescribed in the preceding paragraph.
中文原文 再生能源發展條例第4條
主管機關為推廣設置再生能源發電設備,應考量我國氣候環境、用電需求特性與各類別再生能源之經濟效益、技術發展及其他因素。
再生能源發電設備達二千瓩以上者,由中央主管機關認定;未達二千瓩者,由直轄市或縣(市)主管機關認定。
經主管機關依前項規定認定之再生能源發電設備,適用本條例有關併網、躉購之規定。
前項再生能源發電設備之能源類別、裝置容量、認定程序及其他相關事項之辦法,由中央主管機關定之。
電業得依前項辦法設置裝置容量未達二千瓩且利用再生能源之自用發電設備。

English translation for reference only; the Chinese text prevails. Not legal advice.