Renewable Energy Development Act Article 20-1

The central competent authority shall notify the enterprise to make improvements within a specified time limit for a geothermal energy exploration or development permit under any of the following circumstances. Those who fail to improve by the notified deadline will be imposed with a fine of no less than NT$300,000 but no more than NT$1,500,000 and ordered to make improvements again within a designated time period. Enterprises that still fail to improve shall be continuously penalised per instance:1.Failure to explore geothermal energy in accordance with the content of the geothermalenergy exploration permit, or failure to develop geothermal energy in accordance with thecontent of the geothermal energy development permit.2.The reinjection ratio of tail water after power generation violates Article 15-3, Paragraph 5.3.For violation of Article 15-4, Paragraph 2, namely, the use of explored or developed geothermal energyforpurposesotherthan geothermal power generation equipment without the approval of the central competent authority.4.Failure to dispose of approved structures in accordance with Article 15-4, Paragraph 3, after the invalidation of the geothermal energy exploration and/or development permit.Geothermal energy exploration or development permit holders who violate Article 15-3, Paragraph 6, or Article 15-4, Paragraph 1, and fail to submit for reference or provide information on time, or provide false information should be notified by the central competent authority of the deadline for improvement. If no improvement is made within the time limit, a fine ranging from NT$200,000 to NT$1,000,000 shall be imposed, and they will be ordered to make improvements again within a designated time period. Enterprises that still fail to improve within the time limit shall be continuously penalised per instance.In the event the circumstance mentioned in Subparagraph 1 of Paragraph 1 is serious, the central competent authority may revoke or annul the geothermal energy exploration or development permit.
中文原文 再生能源發展條例第20-1條
取得地熱能探勘許可或地熱能開發許可者,有下列情形之一,中央主管機關應通知限期改善;屆期未改善,處新臺幣三十萬元以上一百五十萬元以下罰鍰,並再通知其限期改善;屆期仍未改善,得按次處罰:
一、未依地熱能探勘許可內容探勘地熱能,或未依地熱能開發許可內容開發地熱能。
二、地熱能發電設備發電後尾水之回注比例違反第十五條之三第五項規定。
三、違反第十五條之四第二項規定,未經中央主管機關核准而將探勘或開發之地熱能供地熱能發電設備以外之用途。
四、於地熱能探勘許可或地熱能開發許可失效後,未依第十五條之四第三項規定處理經許可設置之構造物。
取得地熱能探勘許可或地熱能開發許可者,違反第十五條之三第六項或第十五條之四第一項規定,未依時送備查或提供資料,或資料不實,中央主管機關應通知限期改善;屆期未改善,處新臺幣二十萬元以上一百萬元以下罰鍰,並再通知其限期改善;屆期仍未改善,得按次處罰。
有第一項第一款之情形,情節重大者,中央主管機關並得撤銷或廢止地熱能探勘許可或地熱能開發許可。

English translation for reference only; the Chinese text prevails. Not legal advice.