Water Act Article 82
Land lying within the line of a waterway management plan or the scope of land line may be requisitioned by the government according to law after the authority-in-charge submits its plan to the superior authority for approval and public announcement. As to such land not requisitioned, the authority-in-charge may restrict its use for the purpose of flood control.The land lying within the line of a waterway management plan or the scope of land line, when promulgated, shall be subject to a regular and comprehensive review by the authority-in-charge. The authority-in-charge, however, may conduct timely revision or amendments in case there is a drastic change to the waterway caused by natural disaster.In case that private land or existing dike land becomes unusable because they have been announced by the authority-in-charge, based on paragraph 1 above, as falling within the line of a waterway management plan or the scope of land line for installing flood-control facilities or for other waterway management projects such as river cutoff or expansion of river cross sections, the authority-in-charge may requisition the land if necessary.Private land located in river areas which has become unusable due to reasons specified in the preceding paragraph may apply for transfer of plot ratio if the land is located within the scope of an urban plan already approved by the authority-in-charge but has not yet been requisitioned. In this case the transfer of plot ratio should be administered in accordance with the rules specified in Article 83-1, paragraph 2 of the Urban Planning Act, including the methods to determine the transferable plot ratio, the location of the receiving land base, the maximum plot ratio for the receiving land base, the method of transfer and administrative procedures, etc.The formula for the plot ratio transfer shall be established collaboratively by the Ministry of Interior Affairs and the Ministry of Economic Affairs.
中文原文 水利法第82條
水道治理計畫線或用地範圍線內之土地,經主管機關報請上級主管機關核定公告後,得依法徵收之;未徵收者,為防止水患,並得限制其使用。
水道治理計畫線或用地範圍線內之土地經公告實施後,主管機關應定期辦理通盤檢討。
但因重大天然災害致水道遽烈變遷時,得適時修正變更。
主管機關依第一項公告之水道治理計畫線或用地範圍線內施設防洪設施所需之用地,或依計畫所為截彎取直或擴大通洪斷面辦理河道治理,致無法使用之私有土地及既有堤防用地,應視實際需要辦理徵收。
河川區域內依前項致無法使用之私有土地,其位於都市計畫範圍內者,經主管機關核定實施計畫,而尚未辦理徵收前,得準用都市計畫法第八十三條之一第二項所定辦法有關可移出容積訂定方式、可移入容積地區範圍、接受基地可移入容積上限、移轉方式及作業方法等規定辦理容積移轉。
前項容積移轉之換算公式,由內政部會同經濟部訂定。
水道治理計畫線或用地範圍線內之土地經公告實施後,主管機關應定期辦理通盤檢討。
但因重大天然災害致水道遽烈變遷時,得適時修正變更。
主管機關依第一項公告之水道治理計畫線或用地範圍線內施設防洪設施所需之用地,或依計畫所為截彎取直或擴大通洪斷面辦理河道治理,致無法使用之私有土地及既有堤防用地,應視實際需要辦理徵收。
河川區域內依前項致無法使用之私有土地,其位於都市計畫範圍內者,經主管機關核定實施計畫,而尚未辦理徵收前,得準用都市計畫法第八十三條之一第二項所定辦法有關可移出容積訂定方式、可移入容積地區範圍、接受基地可移入容積上限、移轉方式及作業方法等規定辦理容積移轉。
前項容積移轉之換算公式,由內政部會同經濟部訂定。