Implementation Regulations Governing Renewable Energy Certificates Article 10

If an investigation verifies that any of the following matters occur with the Applicant, the BSMI shall cancel the issued certificate, announce the cancellation on the T-REC Center platform, and notify the relevant authority (organization):1. Repeated application for issuance of Certificates2. Falsifying power generation data.3. Changes identified by the T-REC Center.The accrual of electricity by the Applicant referred to in the preceding paragraph shall cease from the date of certificate cancellation. The Applicant may reapply to a recognized inspection body for T-REC facility inspection no earlier than six months after the cancellation date. Upon passing the inspection, electricity accumulation may resume. Electricity generated during the suspension period shall not be eligible for certification.
中文原文 再生能源憑證實施辦法第10條
經查證申請人有下列情事之一者,由標準局撤銷已核發之憑證,公告於憑證中心平台,並通知相關機關(構):
一、重複申請核發憑證。
二、偽造電量數據。
三、經憑證中心認定之變更事項。
前項申請人自撤銷憑證之日起停止累計電量,並於六個月後始得向查驗機構申請發電設備查核,經查核通過後,申請人得向憑證中心申請恢復累計電量,停止累計期間之電量不得計入憑證電量。

English translation for reference only; the Chinese text prevails. Not legal advice.