The Electricity Act Article 78

An Electricity Enterprise for which any of the violations below apply shall be subject to a fine ranging from NT$1,000,000 to NT$10,000,000 imposed by the competent authority and given a time limit to correct the violation. An Electricity Enterprise that fails to correct the violations upon the expiration of the given time limit shall be fined consecutively:1. Failing to set up or update a power grid geographical information management system as prescribed in paragraph 2, Article 25, or refusing to provide supplementary information or to accept auditing as prescribed in the same article;2. Failing to repair, alter or replace the Electricity Facilities or safety protection devices that do not conform to the requirements within the time limit in violation of paragraph 1, Article 67;3. Evading, impeding or refusing auditing or inspection in violation of paragraph 2, Article 67.
中文原文 電業法第78條
電業有下列情形之一者,由主管機關處新臺幣一百萬元以上一千萬元以下罰鍰,並得限期改善;屆期未改善者,得按次處罰:
一、未依第二十五條第二項規定建立或更新電力網地理資訊管理系統、拒絕補充說明或接受檢查。
二、違反第六十七條第一項規定,未於期限內修理或改換不合規定之電業設備或安全保護設施。
三、違反第六十七條第二項規定,規避、妨礙或拒絕查驗。

English translation for reference only; the Chinese text prevails. Not legal advice.