Mining Act Article 65

In one of the following situations, the competent authority shall notify the mineral right holder to improve within a specified time limit or temporarily suspend the exploration and mining project1.Failing to comply with the conceptualized exploration plans and drawings, conceptualized mining plans and drawings or mining construction plans and drawings to conduct constructions of exploration or mining.2.Failing to implement according to mine environment maintenance plan or annual mining construction plans and drawings.3.Mining work is damaging mineral resources or harmful to the safety of mining workers.4.Mining projects determined by the competent authority to be harmful to public interests.If the mining land has passed the review of the environmental impact statement or assessment report, the competent authority shall, in conjunction with the central competent authority of environmental protection, conduct the supervision and inspection of the mining constructions.
中文原文 礦業法第65條
礦業工程有下列情形之一者,主管機關應通知礦業權者限期改善或暫行停止探採礦工程:
一、未依探礦構想書圖、開採構想書圖、或開採及施工計畫書圖實施探採礦工程。
二、未依礦場環境維護計畫或年度施工計畫書圖執行。
三、礦業工程危害礦產資源或礦場作業人員安全。
四、其他經主管機關認定礦業工程妨害公益。
礦業用地如曾通過環境影響說明書或評估書審查者,主管機關應會同中央環境保護主管機關辦理礦業工程之監督查核工作。

English translation for reference only; the Chinese text prevails. Not legal advice.