Mining Act Article 47
To use the land, the mineral right holder shall apply for review by attaching the mining and construction plans and drawings, the shutdown plan of mine, and the documents specified by the competent authority. The mining land would be approved based on the area where the mineral right holder must use, the total mined amount, and the final elevation. However, if the mining method has no stage elevation, the final elevation is exempted from approval.If the land mentioned in the preceding Paragraph is private land, it shall attach the consent letters of owners of the land and building and those obtaining right to use such land and buildings; if it is public land, it shall attach the consent documents of the land management authorities. If the public land has established other rights, the consent letters from other rights holders shall be attached.After the competent authority accepts the application, it shall notify the mineral right holder to conduct and follow the procedures under Paragraph 1 and 2 of Article 31. However, it does not apply to those required to conduct environmental impact assessment in accordance with the Environmental Impact Assessment Act.After the competent authority accepts the application, it shall survey the land applied for usage and consult for advices with authorities of environmental protection, soil and water conservation, land use and other relevant authorities.In one of the following situations, the application for approval of mining land by the mineral right holder shall be dismissed:1.Failing to pay the application fee or survey fee, and after the competent authority has notified to pay within a given period of time, still failing to pay as such period expires.2.Failing to attach complete plans, drawings and documents required under this Act or other relevant laws and regulations or their content is incomplete, and after the competent authority has notified to supplement and amend within a given period of time, still failing to supplement and amend as such period expires or the supplement and amendment is incomplete.3.Failing to show the direction to conduct surveys on the date specified by the competent authority, or failing to specify the land applied for usage during the survey, or that the area specified during the survey is completely inconsistent with the mining and construction plans and drawings.4.Any matters under this Act or other laws and regulations which shall be dismissed or not be approved.After approving the mining land, if the mineral right holder conducts mining constructions and reaches the allowed total excavation production and final elevation approved under Paragraph 1, the mining constructions shall be stopped. If the mineral right holder wishes to continue to conduct mining constructions within the original approved mining land, the mineral right holder shall apply for approval of mining land again.The regulations governing the acceptance of applications for approval of mining land, the review process, and other matters for compliance under Paragraph 1, Paragraph 2, and Paragraph 4 shall be prescribed by the competent authority in consultation with relevant authorities.
中文原文 礦業法第47條
礦業權者使用土地,應檢具開採及施工計畫書圖、礦場關閉計畫、主管機關指定之文件,向主管機關申請審查,就其必須使用之面積、可開採總量及最終高程予以核定礦業用地。
但開採方式無階段高程者,免予核定最終高程。
前項土地為私有土地者,應併附土地與建築物所有人及使用權人之同意書;為公有者,應併附土地管理機關同意文件,如該公有土地已設定他項權利者,應併附他項權利人之同意書。
主管機關受理申請後,應通知礦業權者依第三十一條第一項及第二項之程序辦理。
但依環境影響評估法應辦理環境影響評估者,不適用之。
主管機關受理申請後,應勘查申請使用土地,徵詢環境保護、水土保持、土地使用及其他相關機關之意見。
礦業權者申請核定礦業用地有下列情形之一者,應駁回其申請:
一、未繳納申請費或勘查費,經主管機關通知限期繳納,屆期未繳納。
二、依本條或其他相關法令規定應檢具之書圖文件不齊全或其內容不完備,經主管機關限期補正,屆期未補正或補正不完備。
三、未依主管機關指定日期導往勘查、勘查時未能指明其申請使用土地或勘查時所指定之區域與開採及施工計畫書圖完全不符。
四、依本法或其他法規應駁回或不予核定之事項。
礦業用地核定後,礦業權者實施採礦工程如已達第一項核定之可開採總量或最終高程時,應停止採礦工程。
礦業權者如欲於原核定礦業用地內,繼續實施採礦工程,應重新申請核定礦業用地。
第一項、第二項及第四項申請核定礦業用地之受理、審核流程及其他應遵行事項之辦法,由主管機關會商相關機關定之。
但開採方式無階段高程者,免予核定最終高程。
前項土地為私有土地者,應併附土地與建築物所有人及使用權人之同意書;為公有者,應併附土地管理機關同意文件,如該公有土地已設定他項權利者,應併附他項權利人之同意書。
主管機關受理申請後,應通知礦業權者依第三十一條第一項及第二項之程序辦理。
但依環境影響評估法應辦理環境影響評估者,不適用之。
主管機關受理申請後,應勘查申請使用土地,徵詢環境保護、水土保持、土地使用及其他相關機關之意見。
礦業權者申請核定礦業用地有下列情形之一者,應駁回其申請:
一、未繳納申請費或勘查費,經主管機關通知限期繳納,屆期未繳納。
二、依本條或其他相關法令規定應檢具之書圖文件不齊全或其內容不完備,經主管機關限期補正,屆期未補正或補正不完備。
三、未依主管機關指定日期導往勘查、勘查時未能指明其申請使用土地或勘查時所指定之區域與開採及施工計畫書圖完全不符。
四、依本法或其他法規應駁回或不予核定之事項。
礦業用地核定後,礦業權者實施採礦工程如已達第一項核定之可開採總量或最終高程時,應停止採礦工程。
礦業權者如欲於原核定礦業用地內,繼續實施採礦工程,應重新申請核定礦業用地。
第一項、第二項及第四項申請核定礦業用地之受理、審核流程及其他應遵行事項之辦法,由主管機關會商相關機關定之。