Regulations for Bid Bond, Guarantee Bond and Other Guarantees Article 24
An entity may, upon considering the characteristics and actual needs of the procurement, prescribe in the tender documentation that the winning tenderer shall deposit a warranty bond, before being paid for the subject matter of the contract being performed upon passing the inspection and acceptance. Where the warranty period is commenced in stages, the bond may also be deposited in stages.The warranty bond referred in the preceding paragraph may be substituted by a performance bond or contract value payable of the like amount.
中文原文 押標金保證金暨其他擔保作業辦法第24條
機關得視案件性質及實際需要,於招標文件中規定得標廠商於履約標的完成驗收付款前應繳納保固保證金。
其屬分段起算保固期者,並得分段繳納。
前項保固保證金,得以相當額度之履約保證金或應付契約價金代之。
其屬分段起算保固期者,並得分段繳納。
前項保固保證金,得以相當額度之履約保證金或應付契約價金代之。