The Enforcement Rules of the Land Tax Act Article 23
The “prior to the completed construction of the public facilities” as referred to under Subparagraph 2, Paragraph 1 of Article 22 of the Act shall mean the four systems of road, water, drainage, and power that remain under construction.The completion of said four facilities shall mean the opening for truck riding on planned road systems for road projects; the connection with and transmission through planned road systems for water and power projects; and the ability to provide drainage service for drainage projects.The boundary lines for the completed public facility shall be set along the half depth line of the adjacent block on both sides of the road. Where significant difference exists between the blocks on the same side of the road or with very special adjacent landforms, said boundary lines may be determined by the Municipality or County (City) Government according to the actual situation.
中文原文 土地稅法施行細則第23條
本法第二十二條第一項第二款所稱公共設施尚未完竣前,指道路、自來水、排水系統、電力等四項設施尚未建設完竣而言。
前項道路以計畫道路能通行貨車為準;自來水及電力以可自計畫道路接通輸送者為準;排水系統以能排水為準。
公共設施完竣之範圍,應以道路兩旁鄰接街廓之一半深度為準。
但道路同側街廓之深度有顯著差異者或毗鄰地形特殊者,得視實際情形由直轄市或縣(市)政府劃定之。
前項道路以計畫道路能通行貨車為準;自來水及電力以可自計畫道路接通輸送者為準;排水系統以能排水為準。
公共設施完竣之範圍,應以道路兩旁鄰接街廓之一半深度為準。
但道路同側街廓之深度有顯著差異者或毗鄰地形特殊者,得視實際情形由直轄市或縣(市)政府劃定之。