Construction Industry Act Article 19

The contracting project brochure shall include the following items:1. Construction industry registration license number.2. Name and signature of responsible person.3. Signature and sample seal of dedicated engineering staff.4. Matters of rewards and penalties.5. Engineering matters.6. Altered matters.7. Other matters designated by the central governing authority.In the event of any change to any item specified in the previous section, the contracting project brochure and relevant justification documents shall be filed with the central governing authority or the municipal or city (county) governing authority within two months from occurrence of the fact for registration of change, except for matters specified in the contracting project brochure of a professional construction company or civil engineering general contractor and if the central governing authority determines that no application for change of registration is required based on a certain amount or scale.
中文原文 營造業法第19條
承攬工程手冊之內容,應包括下列事項:
一、營造業登記證書字號。
二、負責人簽名及蓋章。
三、專任工程人員簽名及加蓋印鑑。
四、獎懲事項。
五、工程記載事項。
六、異動事項。
七、其他經中央主管機關指定事項。
前項各款情形之一有變動時,應於二個月內檢附承攬工程手冊及有關證明文件,向中央主管機關或直轄市、縣(市)主管機關申請變更。
但專業營造業及土木包工業承攬工程手冊之工程記載事項,經中央主管機關核定於一定金額或規模免予申請記載變更者,不在此限。

English translation for reference only; the Chinese text prevails. Not legal advice.