Urban Renewal Act Article 63
After the allocation of right transformation, the implementer should separately send the written notice to the land and building benefactors within the area of the right transformation, and should process the turnover within a given time limit. If there is no turnover within the given time limit, it will be considered as having already turned over from the following day the time limit is due.
中文原文 都市更新條例第63條
權利變換範圍內,經權利變換分配之土地及建築物,實施者應以書面分別通知受配人,限期辦理接管;逾期不接管者,自限期屆滿之翌日起,視為已接管。