Urban Renewal Act Article 49
To modify right transformation plans can follow the simplified procedures:1. When changes are made because of one of the following situations, the public hearings, public exhibitions, hearings, and review specified in Articles 32 and 33 shall not be needed:(1) Rectification of the content of the plan that had been written or computed wrong or other obvious mistakes.(2) Variations on the allocation of units or parking lots are agreed between allottees or implementers.(3) Trust registration conducted in accordance with Article 25.(4) Transferring, dividing, setting up obligations of land and building or revoking collateral rights, lien rights, or defacement of restricted register during the period of right transformation.(5) Rectifying drawings in accordance with the results of surveying lands or buildings conducted by land administration.(6) Alteration designated by Subparagraph 2, Paragraph 1 in Article 36 shall require a notarization between original and new implementers.2. When changes are made because of one of the following situations, the public hearings, public exhibitions, and hearings specified in Articles 32 and 33 need not be held.(1) The original allottees indicate that they are not willing to participate in allocation anymore. On the other hand, the people who showed they were not willing to participate but changed their minds. If authorities presume that the changes do not affect the variation of other people's rights and profits, there is no necessity to hold an exhibition publicly and a public hearing to declare the changes.(2) As far as the alterations listed in Subparagraph 7 to 10, Paragraph 1 of Article 36 are concerned, if the changes are presumed by competent authorities to make no influence on the original verified urban renewal project plan, there is no need to conduct public exhibition and hearing.(3) Changes made to the items in Subparagraph 1 involve changes to the contents of other plans and the competent authority is sure the right transformation plan originally approved will not be affected.
中文原文 都市更新條例第49條
權利變換計畫之變更,得採下列簡化作業程序辦理:
一、有下列情形之一而辦理變更者,免依第三十二條及第三十三條規定辦理公聽會、公開展覽、聽證及審議:
(一)計畫內容有誤寫、誤算或其他類此之顯然錯誤之更正。
(二)參與分配人或實施者,其分配單元或停車位變動,經變動雙方同意。
(三)依第二十五條規定辦理時之信託登記。
(四)權利變換期間辦理土地及建築物之移轉、分割、設定負擔及抵押權、典權、限制登記之塗銷。
(五)依地政機關地籍測量或建築物測量結果釐正圖冊。
(六)第三十六條第一項第二款所定實施者之變更,經原實施者與新實施者辦理公證。
二、有下列情形之一而辦理變更者,免依第三十二條及第三十三條規定辦理公聽會、公開展覽及聽證:
(一)原參與分配人表明不願繼續參與分配,或原不願意參與分配者表明參與分配,經各級主管機關認定不影響其他權利人之權益。
(二)第三十六條第一項第七款至第十款所定事項之變更,經各級主管機關認定不影響原核定之權利變換計畫。
(三)有第一款各目情形所定事項之變更而涉及其他計畫內容變動,經各級主管機關認定不影響原核定之權利變換計畫。
一、有下列情形之一而辦理變更者,免依第三十二條及第三十三條規定辦理公聽會、公開展覽、聽證及審議:
(一)計畫內容有誤寫、誤算或其他類此之顯然錯誤之更正。
(二)參與分配人或實施者,其分配單元或停車位變動,經變動雙方同意。
(三)依第二十五條規定辦理時之信託登記。
(四)權利變換期間辦理土地及建築物之移轉、分割、設定負擔及抵押權、典權、限制登記之塗銷。
(五)依地政機關地籍測量或建築物測量結果釐正圖冊。
(六)第三十六條第一項第二款所定實施者之變更,經原實施者與新實施者辦理公證。
二、有下列情形之一而辦理變更者,免依第三十二條及第三十三條規定辦理公聽會、公開展覽及聽證:
(一)原參與分配人表明不願繼續參與分配,或原不願意參與分配者表明參與分配,經各級主管機關認定不影響其他權利人之權益。
(二)第三十六條第一項第七款至第十款所定事項之變更,經各級主管機關認定不影響原核定之權利變換計畫。
(三)有第一款各目情形所定事項之變更而涉及其他計畫內容變動,經各級主管機關認定不影響原核定之權利變換計畫。