Building Act Article 70

After a construction project is finished, the proprietor shall apply for usage license jointly with the constructor and the supervisor. The municipal or county (city) (bureau) competent authority of construction shall send persons to perform inspection within 10 days commencing from receipt of the application. Where the main structure, indoor partitions, and the main building equipments are in conformity with the design drawings, the usage license and copies shall be granted. In case of unconformity, the applicants will be notified to make modification and then apply for inspection again. However, the time limit for inspection of the buildings used for the public may be extended to 20 days.Where there is no constructor or supervisor of a building, or the constructor and supervisor, without due reasons, refuse to or fail to jointly submit application after it is reviewed by the Construction Disputes Review Committee, the proprietor may singly apply for the license.Appraisal of the main equipments referred to the first paragraph shall be prescribed in the regulations on construction management.
中文原文 建築法第70條
建築工程完竣後,應由起造人會同承造人及監造人申請使用執照。
直轄市、縣(市)(局)主管建築機關應自接到申請之日起,十日內派員查驗完竣。
其主要構造、室內隔間及建築物主要設備等與設計圖樣相符者,發給使用執照,並得核發謄本;不相符者,一次通知其修改後,再報請查驗。
但供公眾使用建築物之查驗期限,得展延為二十日。
建築物無承造人或監造人,或承造人、監造人無正當理由,經建築爭議事件評審委員會評審後而拒不會同或無法會同者,由起造人單獨申請之。
第一項主要設備之認定,於建築管理規則中定之。

English translation for reference only; the Chinese text prevails. Not legal advice.