Building Act Article 56
For the parts of construction works that require inspection, the municipal or county (city) competent authority of construction shall, upon approval of the construction plan, designate the constructor together with the supervisor to submit reports in time before to continue construction, and the competent authority of construction may carry out inspection at any time.The items and methods of inspecting the above-mentioned parts of construction works that require inspection, as well as the storage term of the inspection records, reporting rules, and the cooperation to be offered by the proprietor, constructor and supervisor shall be prescribed in the regulations on construction management.
中文原文 建築法第56條
建築工程中必須勘驗部分,應由直轄市、縣(市)主管建築機關於核定建築計畫時,指定由承造人會同監造人按時申報後,方得繼續施工,主管建築機關得隨時勘驗之。
前項建築工程必須勘驗部分、勘驗項目、勘驗方式、勘驗紀錄保存年限、申報規定及起造人、承造人、監造人應配合事項,於建築管理規則中定之。
前項建築工程必須勘驗部分、勘驗項目、勘驗方式、勘驗紀錄保存年限、申報規定及起造人、承造人、監造人應配合事項,於建築管理規則中定之。