Urban Road Act Article 11

When urban road construction projects are prepared, the destruction, relocation and compensation affairs of the original buildings constituting an obstacle within the scope of land for urban roads shall be included in the plan at the same time.The owners shall be notified to destroy or relocate within a time frame after the construction projects are confirmed and promulgated. This may be enforced by the responsible authorities in place of the owner when necessary.The abovementioned time frame shall be not less than three months.
中文原文 市區道路條例第11條
市區道路用地範圍內原有障礙建築物之拆除、遷讓、補償事項,應於擬訂各該道路修築計劃時,一併規劃列入。
修築計劃確定公告後,通知所有權人,限期拆除或遷讓,必要時並得代為執行。
前項限期,不得少於三個月。

English translation for reference only; the Chinese text prevails. Not legal advice.