Regulations of Permission on Delineation of Course for Laying, Maintaining, or Modifying Submarine Cables or Pipelines on the Continental Shelf of the Republic of China Article 9
After filing of application for delineation of course as referred to in the preceding three articles, the Competent Authority shall review said application within sixty days; if said application does not fulfill requirements of the Regulations and needs improvement, the said application shall be withheld in a specified duration of time for Owner to revise his application in order to fulfill requirements; failure to complete needed revision within said specified duration of time will result in the rejection of the said application. Permission shall be granted after reviewing application and concluding that application has fulfilled requirements of the Regulations and is consistent with paragraph 2, article 15 of the Law.
中文原文 在中華民國大陸礁層舖設維護變更海底電纜或管道之路線劃定許可辦法第9條
主管機關受理前三條之路線劃定許可申請後,應於六十日內審查;經審查不符合規定,而其情形可以補正者,應訂期限通知所有人補正,不依限補正者,駁回其申請。
經審查符合規定,且無本法第十五條第二項規定情形者,應予許可。
經審查符合規定,且無本法第十五條第二項規定情形者,應予許可。