Regulations on Real Estate Appraisal Article 128
The allocated part of building and land for a condominium after a rights exchange scheme is completed shall take into consideration the architectural plan, material standards, equipment quality, construction costs specified in the rights exchange plan of urban renewal scheme, and the relationship between floor utility ratio before and after the urban renewal scheme and other relevant factors.This appraisal shall be based upon the value of a newly completed property on the date of assessing this urban renewal scheme.
中文原文 不動產估價技術規則第128條
權利變換後區分所有建物及其土地應有部分,應考量都市更新權利變換計畫之建築計畫、建材標準、設備等級、工程造價水準及更新前後樓層別效用比關聯性等因素,以都市更新評價基準日當時之新成屋價格查估之。